This project was a completely new abattoir build, and Allmach was involved from the design stage right through to completion. Allmach supplied over 3,000m of 15mm – 108mm SurePress tube with associated fittings and valves. Pipeline services constructed included cold water, hot water, compressed air and sanitisation lines. The original specification was for an alternative piping system; however the client saw the benefits of using the SurePress piping system as Allmach was able to satisfy the project’s narrow installation window with good product availability and on-time delivery service.